Flat Rock Productions and Heavy Metal Works teamed up again to design, build and Install a new 12 ft hood system in Useless Bay Coffee's Kitchen Remodel. The hood was built entirely of Stainless Steel in 2 - 6ft sections in the shop and assembled on site. All the Duct work was also designed and built in the shop.
No comments:
Post a Comment